Lasbela University of Agriculture, Water and Marine Science
- Friday, June 24, 2011, 7:36
- Institutes, Universities
- 1 comment
will be a respectable seat of learning in Pakistan with a special status in the fields of Marine, Veterinary, Water and Agriculture providing higher education, research, training and consultancy services to the public and private sector, while ensuring availability of fully qualified and skilled human resource to work at various tiers of their hierarchy. The students passing out from LUAWMS will be equipped with knowledge, skill, confidence, enterprise built around the latest developments for active participation in socioeconomic growth and uplift of their respective communities.
Our Mission
Substantial contribution towards national economic growth and social development by providing highly qualified and adequately skilled manpower, specially to the province of Balochistan, in the fields of emerging Arts and Sciences along with objective research in the related sectors.
About University
Inception of the University | ||||||||||||||||||||||
|
||||||||||||||||||||||
|
Projects and Works Department
The Project and Works Department is responsible for new constructions, and repairs/ maintenance of the already constructed buildings and roads throughout the campus, including the residences of faculty and staff of this University.
SCOPE OF WORKS
- Look after and maintenance of the existing residential and non-residential buildings.
- Maintenance of Water supply system of the university, which consists of six tube wells, two overhead, kilometers long pipelines etc. These services are provided round the clock.
- Maintenance of kilometers long roads (spread over colonies, offices, hostels and farm) leading to and fro residential and non-residential buildings.
- Maintenance of different kinds and types of furniture of residential and non-residential buildings.
- Maintains a high quality underground sewerage system
- Maintenance of high power and sophisticated electrical installations like transformers connected with sub-stations.
- Maintenance of room air conditioners + water coolers etc.
- Maintained of generators for tube wells, and other important functionaries in case of electric shut downs. All sorts of routine complaints are received here during the morning shift and evening shifts while the 3rd shifts is being carried out emergency complaints.
- The department is involved in the arrangements phase of all the functions like Seminars, and Workshops etc. being held by different faculties of the University
- The department is also responsible for construction, execution and documentation of new works.
- MAINTENANCE SORE: The department maintains the store and is responsible for purchase and issue of store items.
- COMPLAINT CELL: A complaint cell is also maintained by department. All sorts of routine complaints are received here during the morning shift and evening shifts while the 3rd shifts is being carried out emergency complaints.
COMPLETED PROJECTS
Sr. No | Name of Work |
01. | Construction of Ground Water Tank (3000) Gallon at Boys Hostel |
02. | Repair of Fallen Boundary Wall on Back side of DVM Department |
03. | Renovation of a Laboratory for Faculty of Water Sciences at LUAWMS |
04. | Construction of 04x PCC Waste Boxes at LUAWMS |
05. | Establishment of Centralized Examination Hall |
06. | Installation of Submersible at Tube well No. 05 at Boys Hostel / Staff Colony |
07. | Providing & Installation of a New Submersible in Tube well No. 05 at Boys Colony |
08. | Power Line for new Central Library and Main Gate at LUAWMS |
09. | Raising of Boundary Wall near new Boys Hostel |
10. | Construction of Boundary Wall by Jointing different Blocks at Boys Hostel LUAWMS |
11. | Repair / Renovation of Class Rooms |
12. | Raising of Boundary Wall Near Tubewell No. 01 to Yammaha Chowk at LUAWMS |
13. | Construction of Check Posts |
14. | Providing and Installation of 40 HP Submersible at LUAWMS |
15. | Repair of Tube well No. 02 |
16. | Purchasing of 4” UPVC pipes |
17. | Functioning of Tube well No. 01 & Tube well No. 03 at LUAWMS |
18. | Providing and fixing of Iron Chowkat and wire gauze to door at Residence Type-A |
19. | Cleaning / Repair of overhead water tank |
20. | White Washing 4 x Class Rooms inside Old LTM Building |
21. | Providing & Fixing of Hoarding Board at LUAWMS |
22. | Providing & Installation of 4 x ceiling Fans at Inter College LUAWMS |
23. | Providing and Fixing of Fiber Wire Gauze and Wooden Bedding in 4x Blocks at students Hostel |
24. | Providing and Fixing of Sliding Aluminum windows in adhoc Class Rooms LUAWMS |
25. | Repair of Quarters with Jamia Mosque LUAWMS |
26. | PCC Waste Boxes at LUAWMS |
27. | Aluminum for Various Places at LUAWMS |
28. | Grills for Various departments |
29. | Additional Work at Girls Hostel LUAWMS |
30. | Staff Colony Mosque at LUAMWS |
31. | Providing / Installation of 4 x ACs Split (PEL) |
32. | Installation of Diesel Engine 48HP at Boys Hostel LUAWMS |
33. | Construction of faculty of Agriculture and Economics (Double storey). |
34. | Construction of Faculty of Marine Sciences.(Single Storey) |
35. | Rehabilitation/Renovation of Faculty Teachers Bachelor Hostel. |
36. | Rehabilitation/Renovation of Faculty Teachers Bachelor Hostel. |
37. | Rehabilitation of Admin Block. |
38. | Rehabilitation of V.C Lodge. |
39. | Rehabilitation of Officers residences” B” type 2-Nos. |
40. | Rehabilitation of Officers residences.’ ‘C” type 2-Nos. |
41. | Rehabilitation of Staff residences ”D” type 15-Nos. |
42. | Rehabilitation of Staff residences ”E” type 14-Nos. |
43. | Laying of external sewerage system. |
44. | Laying of external water supply system. |
45. | Remodeling / Special Repair of Boys Hostel |
46. | Floor Tiles and additional work in Laboratories. (DVM & Marine Sciences) |
47. | P/f Wardrobes at Students Hostel at Boys Hostel |
48. | Renovation / Rehabilitation of C-3 Residence |
49. | Resurfacing widening and Black topping of Road ( Length 2 KM ) at LUAWMS Uthal |
50 | Construction of 1st Floor Administration Bock |
51. | Repair / Rehabilitation of Quarters (55) /Students Hostel. |
52. | P/L External Sewerage in Residential Area |
53. | Renovation/Rehabilitation of Examination Branch and Finance Department |
54. | External Electrification (phase-1) of LUAWMS |
55. | Repair of Class room Inter College LUAWMS |
56. | Repair of Boundary Wall Girls Hostel LUAWMS |
57. | Repair of Adhoc Class rooms for new Semester |
58. | P/L External Water supply lines at Boys Hostel |
59. | Remodeling Students Mess |
60. | Repair / Remodeling of Old Structures for Class Rooms. |
61. | Renovation / Rehabilitation of Quarters / Staff Colony at Boys Hostel |
62. | Remodeling of Existing 05x Blocks for Students Hostel |
63. | Repair of Girls Hostel (Project No. 01) |
64. | Repair of 4 x Barracks for Students Hostel (Project No.02) |
65. | Renovation of Students Mess (Project No.03) |
66. | Fabrication and Installation of University Sign Board at Main RCD Highway. |
67. | Construction & Raising of walls at Old Boys Hostel |
68. | Fixation of Window Grills and Collapsible Doors at LUAWMS |
69. | Repair of Examination Department |
ON GOING PROJECTS
Sr. No. | Name of Work |
01. | Construction of Volleyball Court at LUAWMS |
02. | Fixation of Window Grills and Collapsible Doors at Central Library, LUAWMS |
About the Author
One Comment on “Lasbela University of Agriculture, Water and Marine Science”
Write a Comment
Gravatars are small images that can show your personality. You can get your gravatar for free today!
You must be logged in to post a comment.
I like this